| Configuration: |
| Cleanroom Project Scope(from structure, HVAC,electric to autoc ontrol) |
1. Cleanroom Structure: Wall Panel, Ceiling Panel, Windows, Doors, Fttings, Flooring |
| 2. HVAC: AHU, Chiller, dehumidifier, Ducting, Piping, etc. |
| 3. Electric: Lighting, Switch, Cables, Wires, Power Distribution Cabinet, etc |
| 4. Auto- control: PLC Controller, Sensors for Humidity and Temperature, Control Panel |
| 5. Process Piping System: Gas, Water Pipeline |
| Equipment |
Air shower, Cargo shower, Mist shower, Dynamic pass box, Static pass box, Sampling booth,Weighing booth, Dispensing booth, |
| Medicine stability test chamber, isolator, VHP sterilizer,Biological safety chamber, FFU, LAF, etc. |
| Temperature |
21-27*C (or as per required) |
| Humidity |
30-60C (or as per required) |
| Application |
Pharmaceutical factory, hospital, medical device factory, electronics factory, food factory, cosmetics factory, etc. |
| Qualification Documents |
CE GMP ISO |
| Full Service |
FAT and SAT Service, Professional Consultation, Training, 24 hours technical support |